Production and dispatch planning

  1. 01

    Defining the need

    The structural element, placing method and placing plan guide the technical assessment.

  2. 02

    Production planning

    The production plan is prepared after the concrete class, consistency, quantity and placing time are shared.

  3. 03

    Dispatch planning

    Vehicle access, placing order and the placing method are considered in the dispatch plan.

  4. 04

    Site preparation

    Formwork, access, placing equipment, the site crew and initial curing preparation are checked before the pour.

View Products

Placing Day

Information to share before placing

Technical requirements, placing time, site access and the placing arrangement should be specified at the outset.

Core planning items

01

Technical requirement

The concrete class, consistency, quantity and structural element to be placed are shared.

02

Placing time

The target placing time and estimated duration are provided for production and vehicle planning.

03

Site access

Vehicle access, waiting areas, pump position and on-site movement conditions are considered.

04

Placing and initial curing

Formwork, equipment, crew, compaction and initial curing preparations are completed before placing.