Technical requirement
The concrete class, consistency, quantity and structural element to be placed are shared.

Contact us for product and pricing information.
The structural element, placing method and placing plan guide the technical assessment.
The production plan is prepared after the concrete class, consistency, quantity and placing time are shared.
Vehicle access, placing order and the placing method are considered in the dispatch plan.
Formwork, access, placing equipment, the site crew and initial curing preparation are checked before the pour.
Placing Day
Technical requirements, placing time, site access and the placing arrangement should be specified at the outset.
Core planning items
The concrete class, consistency, quantity and structural element to be placed are shared.
The target placing time and estimated duration are provided for production and vehicle planning.
Vehicle access, waiting areas, pump position and on-site movement conditions are considered.
Formwork, equipment, crew, compaction and initial curing preparations are completed before placing.